Case Studies

SaskPower

Employing leading-edge technology, BD3 will be the world’s first and largest commercial-scale power plant equipped with a CCS system. Altus Group provided technical services for this project. Our success is measured by accuracy, response times, innovative technology and on-the-ground solutions to facilitating accurate and efficient results.

Read the entire case study here.

 

Enbridge

Enbridge is developing the Woodland Pipeline Extension Project to bring additional crude oil transportation capacity into the Edmonton area by 2015. This new pipeline will run from Enbridge Athabasca's existing Cheecham Terminal, located about 100 km south of Fort McMurray, to Enbridge Pipelines Inc.'s existing Edmonton Terminal, effectively extending the Woodland Pipeline which is now in-service. The Project includes approximately 385-km of pipeline with a diameter of up to 914 mm (36 inches) to transport blended bitumen.

Read the entire Enbridge case study.

 

Kelly Ramsey Redevelopment Project

Built by an early Edmonton blacksmith and a man called Edmonton's “Merchant Prince,” the Kelly and Ramsey Buildings offer a connection to the early years in the City of Edmonton.  The Kelly (1914) and Ramsey (1927) Blocks are actually two buildings, constructed 13 years apart and have been vacant since they were badly damaged by fire on March 24, 2009.  The south and east facades of the historic buildings will be dismantled and rebuilt as the base of a 29-storey, $250-million office and retail project. 

Read the entire case study here.